ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 1808.06641
  4. Cited By
PDFS: Practical Data Feed Service for Smart Contracts
v1v2 (latest)

PDFS: Practical Data Feed Service for Smart Contracts

20 August 2018
J. Guarnizo
Pawel Szalachowski
ArXiv (abs)PDFHTML

Papers citing "PDFS: Practical Data Feed Service for Smart Contracts"

10 / 10 papers shown
DEXO: A Secure and Fair Exchange Mechanism for Decentralized IoT Data Markets
DEXO: A Secure and Fair Exchange Mechanism for Decentralized IoT Data MarketsIEEE Internet of Things Journal (IEEE IoT J.), 2025
Yue Li
Ifteher Alom
Wenhai Sun
Yang Xiao
75
0
0
23 Nov 2025
DeFeed: Secure Decentralized Cross-Contract Data Feed in Web 3.0 for Connected Autonomous Vehicles
DeFeed: Secure Decentralized Cross-Contract Data Feed in Web 3.0 for Connected Autonomous VehiclesACM Transactions on Autonomous and Adaptive Systems (TAAS), 2025
Xingwu Sun
Runhua Xu
Wei Ni
Li Duan
Chao Li
312
1
0
15 May 2025
Active External Calls for Blockchain and Distributed Ledger
  Technologies: Debunking cited inability of Blockchain and DLT to make
  external calls
Active External Calls for Blockchain and Distributed Ledger Technologies: Debunking cited inability of Blockchain and DLT to make external calls
J. Ellul
Gordon J. Pace
153
0
0
10 Jan 2023
Blockchain Oracle Design Patterns
Blockchain Oracle Design Patterns
A. Pasdar
Zhongli Dong
Young Choon Lee
186
28
0
17 Jun 2021
Towards External Calls for Blockchain and Distributed Ledger Technology
Towards External Calls for Blockchain and Distributed Ledger Technology
J. Ellul
Gordon J. Pace
186
5
0
13 May 2021
AQUAREUM: Non-Equivocating Censorship-Evident Centralized Ledger with EVM-Based Verifiable Execution using Trusted Computing and Blockchain
AQUAREUM: Non-Equivocating Censorship-Evident Centralized Ledger with EVM-Based Verifiable Execution using Trusted Computing and Blockchain
I. Homoliak
Pawel Szalachowski
Martin Peresini
Pawel Szalachowski
218
11
0
27 May 2020
The Security Reference Architecture for Blockchains: Towards a
  Standardized Model for Studying Vulnerabilities, Threats, and Defenses
The Security Reference Architecture for Blockchains: Towards a Standardized Model for Studying Vulnerabilities, Threats, and DefensesIEEE Communications Surveys and Tutorials (COMST), 2019
I. Homoliak
Sarad Venugopalan
Qingze Hum
Daniël Reijsbergen
Richard Schumi
Pawel Szalachowski
345
93
0
22 Oct 2019
A Blueprint for Interoperable Blockchains
A Blueprint for Interoperable Blockchains
Tien Tuan Anh Dinh
Anwitaman Datta
Beng Chin Ooi
271
8
0
02 Oct 2019
A Security Reference Architecture for Blockchains
A Security Reference Architecture for Blockchains
I. Homoliak
Sarad Venugopalan
Qingze Hum
Pawel Szalachowski
200
36
0
15 Apr 2019
Permissionless Blockchains and Secure Logging
Permissionless Blockchains and Secure Logging
Chunpeng Ge
Siwei Sun
Pawel Szalachowski
219
10
0
10 Mar 2019
1
Page 1 of 1