ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 2011.02082
  4. Cited By
DeepReach: A Deep Learning Approach to High-Dimensional Reachability

DeepReach: A Deep Learning Approach to High-Dimensional Reachability

4 November 2020
Somil Bansal
Claire Tomlin
ArXiv (abs)PDFHTML

Papers citing "DeepReach: A Deep Learning Approach to High-Dimensional Reachability"

50 / 95 papers shown
How to Train Your Latent Control Barrier Function: Smooth Safety Filtering Under Hard-to-Model Constraints
How to Train Your Latent Control Barrier Function: Smooth Safety Filtering Under Hard-to-Model Constraints
Kensuke Nakamura
Arun L. Bishop
Steven Man
Aaron M. Johnson
Zachary Manchester
Andrea V. Bajcsy
100
0
0
23 Nov 2025
Statistically Assuring Safety of Control Systems using Ensembles of Safety Filters and Conformal Prediction
Statistically Assuring Safety of Control Systems using Ensembles of Safety Filters and Conformal Prediction
Ihab Tabbara
Yuxuan Yang
Hussein Sibai
128
0
0
11 Nov 2025
Manifold-constrained Hamilton-Jacobi Reachability Learning for Decentralized Multi-Agent Motion Planning
Manifold-constrained Hamilton-Jacobi Reachability Learning for Decentralized Multi-Agent Motion Planning
Qingyi Chen
Ruiqi Ni
Jun Kim
A. H. Qureshi
128
0
0
05 Nov 2025
MADR: MPC-guided Adversarial DeepReach
MADR: MPC-guided Adversarial DeepReach
Ryan Teoh
S. Tonkens
William Sharpless
Aijia Yang
Zeyuan Feng
Somil Bansal
Sylvia Herbert
93
0
0
21 Oct 2025
Provably Optimal Reinforcement Learning under Safety Filtering
Provably Optimal Reinforcement Learning under Safety Filtering
Donggeon David Oh
D. Nguyen
Haimin Hu
J. F. Fisac
OffRL
128
0
0
20 Oct 2025
From Refusal to Recovery: A Control-Theoretic Approach to Generative AI Guardrails
From Refusal to Recovery: A Control-Theoretic Approach to Generative AI Guardrails
Ravi Pandya
Madison Bland
D. Nguyen
Changliu Liu
J. F. Fisac
Andrea V. Bajcsy
138
1
0
15 Oct 2025
MAD-PINN: A Decentralized Physics-Informed Machine Learning Framework for Safe and Optimal Multi-Agent Control
MAD-PINN: A Decentralized Physics-Informed Machine Learning Framework for Safe and Optimal Multi-Agent Control
Manan Tayal
Aditya Singh
Shishir Kolathaya
Somil Bansal
251
0
0
28 Sep 2025
Preemptive Detection and Steering of LLM Misalignment via Latent Reachability
Preemptive Detection and Steering of LLM Misalignment via Latent Reachability
Sathwik Karnik
Somil Bansal
LLMSV
135
2
0
25 Sep 2025
AnySafe: Adapting Latent Safety Filters at Runtime via Safety Constraint Parameterization in the Latent Space
AnySafe: Adapting Latent Safety Filters at Runtime via Safety Constraint Parameterization in the Latent Space
Sankalp Agrawal
Junwon Seo
Kensuke Nakamura
Ran Tian
Andrea V. Bajcsy
116
1
0
23 Sep 2025
From Space to Time: Enabling Adaptive Safety with Learned Value Functions via Disturbance Recasting
From Space to Time: Enabling Adaptive Safety with Learned Value Functions via Disturbance Recasting
S. Tonkens
Nikhil Shinde
Azra Begzadić
Michael C. Yip
Jorge Cortés
Sylvia Herbert
OffRL
86
1
0
23 Sep 2025
EigenSafe: A Spectral Framework for Learning-Based Stochastic Safety Filtering
EigenSafe: A Spectral Framework for Learning-Based Stochastic Safety Filtering
Inkyu Jang
Jonghae Park
Chams E. Mballo
Sihyun Cho
Claire J. Tomlin
H. J. Kim
111
0
0
22 Sep 2025
ORN-CBF: Learning Observation-conditioned Residual Neural Control Barrier Functions via Hypernetworks
ORN-CBF: Learning Observation-conditioned Residual Neural Control Barrier Functions via Hypernetworks
Bojan Derajić
Sebastian Bernhard
Wolfgang Hönig
138
0
0
20 Sep 2025
Continuous-Time Value Iteration for Multi-Agent Reinforcement Learning
Continuous-Time Value Iteration for Multi-Agent Reinforcement Learning
Xuefeng Wang
Lei Zhang
Henglin Pu
Ahmed H. Qureshi
Husheng Li
187
0
0
11 Sep 2025
Residual Neural Terminal Constraint for MPC-based Collision Avoidance in Dynamic Environments
Residual Neural Terminal Constraint for MPC-based Collision Avoidance in Dynamic Environments
Bojan Derajić
Mohamed-Khalil Bouzidi
Sebastian Bernhard
Wolfgang Hönig
139
1
0
05 Aug 2025
Solving nonconvex Hamilton--Jacobi--Isaacs equations with PINN-based policy iteration
Solving nonconvex Hamilton--Jacobi--Isaacs equations with PINN-based policy iteration
Hee Jun Yang
Minjung Gim
Yeoneung Kim
111
0
0
21 Jul 2025
Test Automation for Interactive Scenarios via Promptable Traffic Simulation
Test Automation for Interactive Scenarios via Promptable Traffic Simulation
Augusto Mondelli
Yueshan Li
A. Zanardi
Emilio Frazzoli
197
1
0
01 Jun 2025
Reachability Barrier Networks: Learning Hamilton-Jacobi Solutions for Smooth and Flexible Control Barrier Functions
Reachability Barrier Networks: Learning Hamilton-Jacobi Solutions for Smooth and Flexible Control Barrier Functions
Matthew Kim
William Sharpless
Hyun Joe Jeong
S. Tonkens
Somil Bansal
Sylvia Herbert
332
3
0
16 May 2025
Threshold Strategy for Leaking Corner-Free Hamilton-Jacobi Reachability with Decomposed Computations
Chong He
Mugilan Mariappan
Keval Vora
Mo Chen
276
0
0
15 May 2025
Resolving Conflicting Constraints in Multi-Agent Reinforcement Learning with Layered Safety
Resolving Conflicting Constraints in Multi-Agent Reinforcement Learning with Layered Safety
Jason J. Choi
Jasmine Jerry Aloor
Jingqi Li
Maria G. Mendoza
H. Balakrishnan
Claire J. Tomlin
273
6
0
04 May 2025
Bridging Model Predictive Control and Deep Learning for Scalable Reachability Analysis
Bridging Model Predictive Control and Deep Learning for Scalable Reachability Analysis
Zeyuan Feng
Le Qiu
Somil Bansal
167
5
0
04 May 2025
Uncertainty-aware Latent Safety Filters for Avoiding Out-of-Distribution Failures
Uncertainty-aware Latent Safety Filters for Avoiding Out-of-Distribution Failures
Junwon Seo
Kensuke Nakamura
Andrea V. Bajcsy
410
9
0
01 May 2025
HJRNO: Hamilton-Jacobi Reachability with Neural Operators
HJRNO: Hamilton-Jacobi Reachability with Neural Operators
Yankai Li
Mo Chen
242
0
0
28 Apr 2025
Certified Approximate Reachability (CARe): Formal Error Bounds on Deep Learning of Reachable Sets
Certified Approximate Reachability (CARe): Formal Error Bounds on Deep Learning of Reachable Sets
Prashant Solanki
Nikolaus Vertovec
Yannik Schnitzer
Jasper J. van Beers
Coen de Visser
Alessandro Abate
184
2
0
31 Mar 2025
SACA: A Scenario-Aware Collision Avoidance Framework for Autonomous Vehicles Integrating LLMs-Driven Reasoning
SACA: A Scenario-Aware Collision Avoidance Framework for Autonomous Vehicles Integrating LLMs-Driven Reasoning
Shiyue Zhao
Junzhi Zhang
Neda Masoud
Heye Huang
Xingpeng Xia
Chengkun He
LRM
427
3
0
31 Mar 2025
Parametric Value Approximation for General-sum Differential Games with State Constraints
Lei Zhang
Mukesh Ghimire
Wenlong Zhang
Z. Xu
Yi Ren
256
0
0
10 Mar 2025
Learning Nash Equilibrial Hamiltonian for Two-Player Collision-Avoiding Interactions
Learning Nash Equilibrial Hamiltonian for Two-Player Collision-Avoiding InteractionsAmerican Control Conference (ACC), 2025
Lei Zhang
Siddharth Das
Tanner Merry
Wenlong Zhang
Yi Ren
382
0
0
10 Mar 2025
Scalable Back-Propagation-Free Training of Optical Physics-Informed Neural Networks
Scalable Back-Propagation-Free Training of Optical Physics-Informed Neural Networks
Yequan Zhao
Xinling Yu
Xian Xiao
Zhe Chen
Ziyue Liu
G. Kurczveil
R. Beausoleil
Shixuan Liu
Zheng Zhang
356
1
0
17 Feb 2025
Infinite-Horizon Value Function Approximation for Model Predictive Control
Infinite-Horizon Value Function Approximation for Model Predictive ControlIEEE Robotics and Automation Letters (IEEE RA-L), 2025
Armand Jordana
Sébastien Kleff
Arthur Haffemayer
Joaquim Ortiz de Haro
Justin Carpentier
Nicolas Mansard
Ludovic Righetti
263
5
0
10 Feb 2025
Your Learned Constraint is Secretly a Backward Reachable Tube
Your Learned Constraint is Secretly a Backward Reachable Tube
Mohamad Qadri
Gokul Swamy
Jonathan Francis
Michael Kaess
Andrea Bajcsy
427
5
0
26 Jan 2025
Experimental Demonstration of an Optical Neural PDE Solver via On-Chip PINN TrainingOptical Fiber Communications Conference and Exhibition (OFC), 2025
Yequan Zhao
Xian Xiao
Antoine Descos
Yuan Yuan
Xinling Yu
G. Kurczveil
M. Fiorentino
Zheng Zhang
R. Beausoleil
221
0
0
03 Jan 2025
Enhancing Safety and Robustness of Vision-Based Controllers via
  Reachability Analysis
Enhancing Safety and Robustness of Vision-Based Controllers via Reachability Analysis
Kaustav Chakraborty
Aryaman Gupta
Somil Bansal
291
6
0
29 Oct 2024
RPCBF: Constructing Safety Filters Robust to Model Error and
  Disturbances via Policy Control Barrier Functions
RPCBF: Constructing Safety Filters Robust to Model Error and Disturbances via Policy Control Barrier Functions
Luzia Knoedler
Oswin So
Ji Yin
Mitchell Black
Zachary Serlin
Panagiotis Tsiotras
Javier Alonso-Mora
Chuchu Fan
277
1
0
15 Oct 2024
Convergence Guarantees for Neural Network-Based Hamilton-Jacobi
  Reachability
Convergence Guarantees for Neural Network-Based Hamilton-Jacobi Reachability
William Hofgard
182
2
0
03 Oct 2024
Learning Robust Policies via Interpretable Hamilton-Jacobi
  Reachability-Guided Disturbances
Learning Robust Policies via Interpretable Hamilton-Jacobi Reachability-Guided DisturbancesIEEE International Conference on Robotics and Automation (ICRA), 2024
Hanyang Hu
Xilun Zhang
Xubo Lyu
Mo Chen
217
1
0
29 Sep 2024
System-Level Safety Monitoring and Recovery for Perception Failures in
  Autonomous Vehicles
System-Level Safety Monitoring and Recovery for Perception Failures in Autonomous VehiclesIEEE International Conference on Robotics and Automation (ICRA), 2024
Kaustav Chakraborty
Zeyuan Feng
Sushant Veer
Apoorva Sharma
Boris Ivanovic
Marco Pavone
Somil Bansal
253
6
0
26 Sep 2024
Robots that Learn to Safely Influence via Prediction-Informed
  Reach-Avoid Dynamic Games
Robots that Learn to Safely Influence via Prediction-Informed Reach-Avoid Dynamic GamesIEEE International Conference on Robotics and Automation (ICRA), 2024
Ravi Pandya
Changliu Liu
Andrea V. Bajcsy
214
2
0
18 Sep 2024
Robots that Suggest Safe Alternatives
Robots that Suggest Safe Alternatives
Hyun Joe Jeong
Andrea V. Bajcsy
Andrea Bajcsy
OffRL
390
2
0
15 Sep 2024
Cooptimizing Safety and Performance with a Control-Constrained
  Formulation
Cooptimizing Safety and Performance with a Control-Constrained FormulationIEEE Control Systems Letters (L-CSS), 2024
Hao Wang
Adityaya Dhande
Somil Bansal
158
4
0
10 Sep 2024
Gait Switching and Enhanced Stabilization of Walking Robots with Deep
  Learning-based Reachability: A Case Study on Two-link Walker
Gait Switching and Enhanced Stabilization of Walking Robots with Deep Learning-based Reachability: A Case Study on Two-link WalkerIEEE Conference on Decision and Control (CDC), 2024
Xingpeng Xia
Jason J. Choi
Ayush Agrawal
Koushil Sreenath
Claire J. Tomlin
Somil Bansal
202
1
0
10 Sep 2024
Online Time-Informed Kinodynamic Motion Planning of Nonlinear Systems
Online Time-Informed Kinodynamic Motion Planning of Nonlinear Systems
Fei Meng
Jianbang Liu
Haojie Shi
Han Ma
Hongliang Ren
Max Q.-H. Meng
339
6
0
03 Jul 2024
AVOCADO: Adaptive Optimal Collision Avoidance driven by Opinion
AVOCADO: Adaptive Optimal Collision Avoidance driven by Opinion
Diego Martínez Baselga
Eduardo Sebastián
Eduardo Montijano
L. Riazuelo
C. Sagüés
Luis Montano
516
4
0
29 Jun 2024
Human-AI Safety: A Descendant of Generative AI and Control Systems
  Safety
Human-AI Safety: A Descendant of Generative AI and Control Systems Safety
Andrea V. Bajcsy
J. F. Fisac
252
8
0
16 May 2024
Parameterized Fast and Safe Tracking (FaSTrack) using Deepreach
Parameterized Fast and Safe Tracking (FaSTrack) using DeepreachConference on Learning for Dynamics & Control (L4DC), 2024
Hyun Joe Jeong
Zheng Gong
Somil Bansal
Sylvia Herbert
159
5
0
11 Apr 2024
RAnGE: Reachability Analysis for Guaranteed Ergodicity
RAnGE: Reachability Analysis for Guaranteed Ergodicity
Henry Berger
Ian Abraham
189
0
0
04 Apr 2024
Boundary-Aware Value Function Generation for Safe Stochastic Motion
  Planning
Boundary-Aware Value Function Generation for Safe Stochastic Motion Planning
Junhong Xu
Kai-Li Yin
Jason M. Gregory
Kris Hauser
Lantao Liu
277
3
0
22 Mar 2024
Providing Safety Assurances for Systems with Unknown Dynamics
Providing Safety Assurances for Systems with Unknown DynamicsIEEE Control Systems Letters (L-CSS), 2024
Hao Wang
Javier Borquez
Somil Bansal
165
4
0
09 Mar 2024
State-Constrained Zero-Sum Differential Games with One-Sided Information
State-Constrained Zero-Sum Differential Games with One-Sided Information
Mukesh Ghimire
Lei Zhang
Zhenni Xu
Yi Ren
215
2
0
05 Mar 2024
Goal-Reaching Trajectory Design Near Danger with Piecewise Affine
  Reach-avoid Computation
Goal-Reaching Trajectory Design Near Danger with Piecewise Affine Reach-avoid Computation
Long Kiu Chung
Wonsuhk Jung
Chuizheng Kong
Shreyas Kousik
376
3
0
23 Feb 2024
Formal Synthesis of Controllers for Safety-Critical Autonomous Systems:
  Developments and Challenges
Formal Synthesis of Controllers for Safety-Critical Autonomous Systems: Developments and Challenges
Xiang Yin
Bingzhao Gao
Xiao Yu
216
44
0
20 Feb 2024
Safety Filters for Black-Box Dynamical Systems by Learning
  Discriminating Hyperplanes
Safety Filters for Black-Box Dynamical Systems by Learning Discriminating Hyperplanes
Will Lavanakul
Jason J. Choi
Koushil Sreenath
Claire J. Tomlin
272
18
0
07 Feb 2024
12
Next