ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 2009.13347
  4. Cited By
A Review of Evolutionary Multi-modal Multi-objective Optimization

A Review of Evolutionary Multi-modal Multi-objective Optimization

28 September 2020
Ryoji Tanabe
H. Ishibuchi
ArXiv (abs)PDFHTML

Papers citing "A Review of Evolutionary Multi-modal Multi-objective Optimization"

18 / 18 papers shown
Design of mechanisms for ensuring the execution of tasks in project planning
Design of mechanisms for ensuring the execution of tasks in project planningEastern-European Journal of Enterprise Technologies (EEJET), 2023
Oksana Mulesa
Petro Horvat
Tamara Radivilova
Volodymyr Sabadosh
Oleksii Baranovskyi
Sergii Duran
158
9
0
03 Jan 2025
Evolutionary Computation for the Design and Enrichment of
  General-Purpose Artificial Intelligence Systems: Survey and Prospects
Evolutionary Computation for the Design and Enrichment of General-Purpose Artificial Intelligence Systems: Survey and Prospects
Javier Poyatos
Javier Del Ser
Salvador Garcia
H. Ishibuchi
Daniel Molina
I. Triguero
Bing Xue
Xin Yao
Francisco Herrera
435
3
0
03 Jun 2024
Coevolutionary Framework for Generalized Multimodal Multi-objective
  Optimization
Coevolutionary Framework for Generalized Multimodal Multi-objective OptimizationIEEE/CAA Journal of Automatica Sinica (JCAS), 2022
Wenhua Li
X. Yao
Keqin Li
Rui Wang
Tao Zhang
Ling Wang
470
60
0
02 Dec 2022
Runtime Analysis for the NSGA-II: Proving, Quantifying, and Explaining
  the Inefficiency For Many Objectives
Runtime Analysis for the NSGA-II: Proving, Quantifying, and Explaining the Inefficiency For Many ObjectivesIEEE Transactions on Evolutionary Computation (TEVC), 2022
Weijie Zheng
Benjamin Doerr
380
57
0
23 Nov 2022
Neural Architecture Search as Multiobjective Optimization Benchmarks:
  Problem Formulation and Performance Assessment
Neural Architecture Search as Multiobjective Optimization Benchmarks: Problem Formulation and Performance AssessmentIEEE Transactions on Evolutionary Computation (TEVC), 2022
Zhichao Lu
Ran Cheng
Yaochu Jin
Kay Chen Tan
Kalyanmoy Deb
296
81
0
08 Aug 2022
Multimodal Multi-objective Optimization: Comparative Study of the
  State-of-the-Art
Multimodal Multi-objective Optimization: Comparative Study of the State-of-the-ArtSwarm and Evolutionary Computation (Swarm Evol. Comput.), 2022
Wenhua Li
Zhang Tao
Rui Wang
Jing-long Liang
187
128
0
11 Jul 2022
A Survey on Learnable Evolutionary Algorithms for Scalable
  Multiobjective Optimization
A Survey on Learnable Evolutionary Algorithms for Scalable Multiobjective OptimizationIEEE Transactions on Evolutionary Computation (TEVC), 2022
Songbai Liu
Qiuzhen Lin
Jianqiang Li
Kay Chen Tan
428
98
0
23 Jun 2022
Multi-Objective Hyperparameter Optimization in Machine Learning -- An
  Overview
Multi-Objective Hyperparameter Optimization in Machine Learning -- An OverviewACM Transactions on Evolutionary Learning and Optimization (TELO), 2022
Florian Karl
Tobias Pielok
Julia Moosbauer
Florian Pfisterer
Stefan Coors
...
Jakob Richter
Michel Lang
Eduardo C. Garrido-Merchán
Juergen Branke
J. Herbinger
AI4CE
463
105
0
15 Jun 2022
Jack and Masters of all Trades: One-Pass Learning Sets of Model Sets
  From Large Pre-Trained Models
Jack and Masters of all Trades: One-Pass Learning Sets of Model Sets From Large Pre-Trained ModelsIEEE Computational Intelligence Magazine (IEEE CIM), 2022
Han Xiang Choong
Yew-Soon Ong
Abhishek Gupta
Caishun Chen
Ray Lim
222
10
0
02 May 2022
Obtaining Smoothly Navigable Approximation Sets in Bi-Objective
  Multi-Modal Optimization
Obtaining Smoothly Navigable Approximation Sets in Bi-Objective Multi-Modal OptimizationParallel Problem Solving from Nature (PPSN), 2022
Renzo J. Scholman
A. Bouter
L. Dickhoff
Tanja Alderliesten
Peter A. N. Bosman
181
3
0
17 Mar 2022
A Simple Evolutionary Algorithm for Multi-modal Multi-objective
  Optimization
A Simple Evolutionary Algorithm for Multi-modal Multi-objective OptimizationIEEE Congress on Evolutionary Computation (CEC), 2022
T. Ray
Mohammad Mohiuddin Mamun
H. Singh
87
8
0
18 Jan 2022
A Novel Non-population-based Meta-heuristic Optimizer Inspired by the
  Philosophy of Yi Jing
A Novel Non-population-based Meta-heuristic Optimizer Inspired by the Philosophy of Yi Jing
Jing Li
Sim Kuan Goh
100
3
0
17 Apr 2021
Niching Diversity Estimation for Multi-modal Multi-objective
  Optimization
Niching Diversity Estimation for Multi-modal Multi-objective OptimizationInternational Conference on Evolutionary Multi-Criterion Optimization (EMO), 2021
Yiming Peng
H. Ishibuchi
64
2
0
31 Jan 2021
Theoretical Analyses of Multiobjective Evolutionary Algorithms on
  Multimodal Objectives
Theoretical Analyses of Multiobjective Evolutionary Algorithms on Multimodal ObjectivesEvolutionary Computation (Evol. Comput.), 2020
Weijie Zheng
Benjamin Doerr
390
28
0
14 Dec 2020
Qualities, challenges and future of genetic algorithms: a literature
  review
Qualities, challenges and future of genetic algorithms: a literature review
A. Vié
Alissa M. Kleinnijenhuis
Doyne, J Farmer
AI4CE
335
28
0
05 Nov 2020
A Niching Indicator-Based Multi-modal Many-objective Optimizer
A Niching Indicator-Based Multi-modal Many-objective OptimizerSwarm and Evolutionary Computation (SEC), 2019
Ryoji Tanabe
H. Ishibuchi
129
76
0
01 Oct 2020
An Easy-to-use Real-world Multi-objective Optimization Problem Suite
An Easy-to-use Real-world Multi-objective Optimization Problem SuiteApplied Soft Computing (ASC), 2020
Ryoji Tanabe
H. Ishibuchi
313
317
0
27 Sep 2020
Decomposition in Decision and Objective Space for Multi-Modal
  Multi-Objective Optimization
Decomposition in Decision and Objective Space for Multi-Modal Multi-Objective OptimizationSwarm and Evolutionary Computation (Swarm Evol. Comput.), 2020
Monalisa Pal
S. Bandyopadhyay
214
48
0
04 Jun 2020
1
Page 1 of 1