Communities
Connect sessions
AI calendar
Organizations
Join Slack
Contact Sales
Search
Open menu
Home
Papers
2104.09621
Cited By
Engineering Sketch Generation for Computer-Aided Design
19 April 2021
Karl D. D. Willis
P. Jayaraman
Joseph G. Lambourne
Hang Chu
Yewen Pu
3DV
Re-assign community
ArXiv (abs)
PDF
HTML
Papers citing
"Engineering Sketch Generation for Computer-Aided Design"
41 / 41 papers shown
B-Rep Distance Functions (BR-DF): How to Represent a B-Rep Model by Volumetric Distance Functions?
Fuyang Zhang
P. Jayaraman
Xiang Xu
Yasutaka Furukawa
175
0
0
18 Nov 2025
Target-Guided Bayesian Flow Networks for Quantitatively Constrained CAD Generation
Wenhao Zheng
Chenwei Sun
Wenbo Zhang
Jiancheng Lv
Xianggen Liu
DiffM
188
0
0
29 Oct 2025
SketchDNN: Joint Continuous-Discrete Diffusion for CAD Sketch Generation
Sathvik Chereddy
John Femiani
DiffM
159
3
0
15 Jul 2025
CReFT-CAD: Boosting Orthographic Projection Reasoning for CAD via Reinforcement Fine-Tuning
Ke Niu
Z. Chen
Haiyang Yu
Yuwen Chen
Teng Fu
Mengyang Zhao
Bin Li
Xiangyang Xue
325
4
0
31 May 2025
CAD-Coder: An Open-Source Vision-Language Model for Computer-Aided Design Code Generation
Anna C. Doris
Md Ferdous Alam
Amin Heyrani Nobari
Faez Ahmed
289
14
0
20 May 2025
CAD-Llama: Leveraging Large Language Models for Computer-Aided Design Parametric 3D Model Generation
Computer Vision and Pattern Recognition (CVPR), 2025
Jiahao Li
Weijian Ma
Xueyang Li
Yunzhong Lou
G. Zhou
Xiangdong Zhou
563
35
0
07 May 2025
Aligning Constraint Generation with Design Intent in Parametric CAD
Evan Casey
Tianyu Zhang
Shu Ishida
John Roger Thompson
John Roger Thompson
Amir Khasahmadi
Joseph George Lambourne
P. Jayaraman
K. Willis
354
2
0
17 Apr 2025
CADCrafter: Generating Computer-Aided Design Models from Unconstrained Images
Computer Vision and Pattern Recognition (CVPR), 2025
Cheng Chen
Jiacheng Wei
Tianrun Chen
Chi Zhang
Xiaofeng Yang
...
Bingchen Yang
Chuan-Sheng Foo
Guosheng Lin
Qixing Huang
Fayao Liu
366
17
0
07 Apr 2025
Revisiting CAD Model Generation by Learning Raster Sketch
AAAI Conference on Artificial Intelligence (AAAI), 2025
Pu Li
Wenhao Zhang
Jianwei Guo
Jinglu Chen
Dong-Ming Yan
3DV
201
5
0
02 Mar 2025
DAVINCI: A Single-Stage Architecture for Constrained CAD Sketch Inference
British Machine Vision Conference (BMVC), 2024
Ahmet Serdar Karadeniz
Dimitrios Mallis
Nesryne Mejri
K. Cherenkova
Anis Kacem
Djamila Aouada
3DV
349
6
0
30 Oct 2024
CadVLM: Bridging Language and Vision in the Generation of Parametric CAD Sketches
European Conference on Computer Vision (ECCV), 2024
Sifan Wu
Amir Khasahmadi
Mor Katz
P. Jayaraman
Yewen Pu
K. Willis
Bang Liu
3DV
216
23
0
26 Sep 2024
Text2CAD: Generating Sequential CAD Models from Beginner-to-Expert Level Text Prompts
Mohammad Sadil Khan
Sankalp Sinha
Talha Uddin Sheikh
Didier Stricker
Sk Aziz Ali
Muhammad Zeshan Afzal
223
17
0
25 Sep 2024
Freehand Sketch Generation from Mechanical Components
ACM Multimedia (MM), 2024
Zhichao Liao
Di Huang
Heming Fang
Yue Ma
Fengyuan Piao
Xinghui Li
Long Zeng
Pingfa Feng
310
15
0
12 Aug 2024
PICASSO: A Feed-Forward Framework for Parametric Inference of CAD Sketches via Rendering Self-Supervision
Ahmet Serdar Karadeniz
Dimitrios Mallis
Nesryne Mejri
K. Cherenkova
Anis Kacem
Djamila Aouada
305
5
0
18 Jul 2024
Parametric Primitive Analysis of CAD Sketches with Vision Transformer
Xiaogang Wang
Liang Wang
Hongyu Wu
Guoqiang Xiao
Kai Xu
214
7
0
29 Jun 2024
Large Language Model Agent as a Mechanical Designer
Yayati Jadhav
A. Farimani
AI4CE
LLMAG
491
24
0
26 Apr 2024
Detecting Generative Parroting through Overfitting Masked Autoencoders
Saeid Asgari Taghanaki
Joseph Lambourne
305
1
0
27 Mar 2024
Geometric Deep Learning for Computer-Aided Design: A Survey
Negar Heidari
Alexandros Iosifidis
AI4CE
3DPC
3DV
366
19
0
27 Feb 2024
BrepGen: A B-rep Generative Diffusion Model with Structured Latent Geometry
ACM Transactions on Graphics (TOG), 2024
Xiang Xu
Joseph G. Lambourne
P. Jayaraman
Zhengqing Wang
Karl D. D. Willis
Yasutaka Furukawa
DiffM
AI4CE
322
93
0
28 Jan 2024
Automatic Reverse Engineering: Creating computer-aided design (CAD) models from multi-view images
Henrik Jobczyk
H. Homann
3DV
206
4
0
23 Sep 2023
SHARP Challenge 2023: Solving CAD History and pArameters Recovery from Point clouds and 3D scans. Overview, Datasets, Metrics, and Baselines
Dimitrios Mallis
Sk Aziz Ali
Elona Dupont
K. Cherenkova
Ahmet Serdar Karadeniz
Mohammad Sadil Khan
Anis Kacem
Gleb Gusev
Djamila Aouada
3DPC
312
16
0
30 Aug 2023
PlankAssembly: Robust 3D Reconstruction from Three Orthographic Views with Learnt Shape Programs
IEEE International Conference on Computer Vision (ICCV), 2023
Wentao Hu
Jia Zheng
Zixin Zhang
Xiaojun Yuan
Jian Yin
Zihan Zhou
3DV
192
10
0
10 Aug 2023
PPI-NET: End-to-End Parametric Primitive Inference
Computer Graphics International Conference (CGI), 2023
Liang Wang
Xiaogang Wang
274
1
0
03 Aug 2023
EigenTrajectory: Low-Rank Descriptors for Multi-Modal Trajectory Forecasting
IEEE International Conference on Computer Vision (ICCV), 2023
Inhwan Bae
Jean Oh
Hae-Gon Jeon
306
67
0
18 Jul 2023
Hierarchical Neural Coding for Controllable CAD Model Generation
International Conference on Machine Learning (ICML), 2023
Xiang Xu
P. Jayaraman
Joseph G. Lambourne
Karl D. D. Willis
Yasutaka Furukawa
341
76
0
30 Jun 2023
AircraftVerse: A Large-Scale Multimodal Dataset of Aerial Vehicle Designs
Neural Information Processing Systems (NeurIPS), 2023
Adam D. Cobb
Anirban Roy
Daniel Elenius
F. M. Heim
Brian Swenson
...
Theodore Bapty
Joseph Hite
K. Ramani
Christopher McComb
Susmit Jha
209
16
0
08 Jun 2023
Neurosymbolic Models for Computer Graphics
Daniel E. Ritchie
Paul Guerrero
R. K. Jones
Niloy J. Mitra
Adriana Schulz
Karl D. D. Willis
Jiajun Wu
3DV
240
39
0
20 Apr 2023
RFEPS: Reconstructing Feature-line Equipped Polygonal Surface
ACM Transactions on Graphics (TOG), 2022
Xu Rui
Zixiong Wang
Bushi Liu
Chen Zong
Shiqing Xin
Mingyan Jiang
Tao Ju
Changhe Tu
212
16
0
07 Dec 2022
Design of Unmanned Air Vehicles Using Transformer Surrogate Models
Adam D. Cobb
Anirban Roy
Daniel Elenius
Susmit Jha
AI4CE
232
2
0
11 Nov 2022
Discovering Design Concepts for CAD Sketches
Neural Information Processing Systems (NeurIPS), 2022
Yuezhi Yang
Hao Pan
251
15
0
26 Oct 2022
Reconstructing editable prismatic CAD from rounded voxel models
ACM SIGGRAPH Conference and Exhibition on Computer Graphics and Interactive Techniques in Asia (SIGGRAPH Asia), 2022
Joseph G. Lambourne
Karl D. D. Willis
P. Jayaraman
Longfei Zhang
Aditya Sanghi
Kamal Rahimi Malekshan
290
54
0
02 Sep 2022
SkexGen: Autoregressive Generation of CAD Construction Sequences with Disentangled Codebooks
International Conference on Machine Learning (ICML), 2022
Xiang Xu
Karl D. D. Willis
Joseph G. Lambourne
Chin-Yi Cheng
P. Jayaraman
Yasutaka Furukawa
214
115
0
11 Jul 2022
SolidGen: An Autoregressive Model for Direct B-rep Synthesis
P. Jayaraman
Joseph G. Lambourne
Nishkrit Desai
Karl D. D. Willis
Aditya Sanghi
Nigel Morris
363
75
0
26 Mar 2022
Neural Face Identification in a 2D Wireframe Projection of a Manifold Object
Computer Vision and Pattern Recognition (CVPR), 2022
Kehan Wang
Jia Zheng
Zihan Zhou
3DV
CVBM
3DH
211
23
0
08 Mar 2022
Point2Cyl: Reverse Engineering 3D Objects from Point Clouds to Extrusion Cylinders
Mikaela Angelina Uy
Yen-Yu Chang
Minhyuk Sung
Purvi Goel
Joseph Lambourne
Tolga Birdal
Leonidas Guibas
3DPC
278
80
0
17 Dec 2021
BLT: Bidirectional Layout Transformer for Controllable Layout Generation
X. Kong
Lu Jiang
Huiwen Chang
Han Zhang
Yuan Hao
Haifeng Gong
Irfan Essa
378
97
0
09 Dec 2021
Vitruvion: A Generative Model of Parametric CAD Sketches
Ari Seff
Wenda Zhou
Nick Richardson
Ryan P. Adams
346
84
0
29 Sep 2021
SketchGen: Generating Constrained CAD Sketches
Neural Information Processing Systems (NeurIPS), 2021
W. Para
S. Bhat
Paul Guerrero
Tom Kelly
Niloy Mitra
Leonidas Guibas
Peter Wonka
3DV
314
94
0
04 Jun 2021
DeepCAD: A Deep Generative Network for Computer-Aided Design Models
IEEE International Conference on Computer Vision (ICCV), 2021
Rundi Wu
Chang Xiao
Changxi Zheng
3DPC
439
258
0
20 May 2021
Computer-Aided Design as Language
Neural Information Processing Systems (NeurIPS), 2021
Yaroslav Ganin
Sergey Bartunov
Yujia Li
E. Keller
Stefano Saliceti
3DV
346
113
0
06 May 2021
Deep Learning for Free-Hand Sketch: A Survey
IEEE Transactions on Pattern Analysis and Machine Intelligence (TPAMI), 2020
Peng Xu
Timothy M. Hospedales
Qiyue Yin
Yi-Zhe Song
Tao Xiang
Liang Wang
3DV
696
146
0
08 Jan 2020
1
Page 1 of 1