ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 2107.00630
  4. Cited By
Variational Diffusion Models
v1v2v3v4v5v6 (latest)

Variational Diffusion Models

1 July 2021
Diederik P. Kingma
Tim Salimans
Ben Poole
Jonathan Ho
    DiffM
ArXiv (abs)PDFHTMLGithub (315★)

Papers citing "Variational Diffusion Models"

50 / 908 papers shown
Scalable Non-Equivariant 3D Molecule Generation via Rotational Alignment
Scalable Non-Equivariant 3D Molecule Generation via Rotational Alignment
Yuhui Ding
Thomas Hofmann
DiffMBDL
385
1
0
11 Jun 2025
Audio Generation Through Score-Based Generative Modeling: Design Principles and Implementation
Ge Zhu
Yutong Wen
Zhiyao Duan
DiffMMedIm
241
3
0
10 Jun 2025
Why Masking Diffusion Works: Condition on the Jump Schedule for Improved Discrete Diffusion
Alan Nawzad Amin
Nate Gruver
Andrew Gordon Wilson
210
8
0
10 Jun 2025
AstroCompress: A benchmark dataset for multi-purpose compression of astronomical dataInternational Conference on Learning Representations (ICLR), 2025
Tuan Truong
Rithwik Sudharsan
Jianlong Wu
Peter Xiangyuan Ma
Ruihan Yang
Stephan Mandt
Joshua S. Bloom
175
0
0
10 Jun 2025
RNE: plug-and-play diffusion inference-time control and energy-based training
RNE: plug-and-play diffusion inference-time control and energy-based training
Jiajun He
Jose Miguel Hernandez-Lobato
Yuanqi Du
Francisco Vargas
466
4
0
06 Jun 2025
Learning normalized image densities via dual score matching
Learning normalized image densities via dual score matching
Florentin Guth
Zahra Kadkhodaie
Eero P. Simoncelli
DiffM
318
8
0
05 Jun 2025
FEAT: Full-Dimensional Efficient Attention Transformer for Medical Video GenerationInternational Conference on Medical Image Computing and Computer-Assisted Intervention (MICCAI), 2025
Huihan Wang
Zhiwen Yang
Hui Zhang
Dan Zhao
Bingzheng Wei
Yan Xu
MedImViT
255
0
0
05 Jun 2025
Sparse Autoencoders, Again?
Sparse Autoencoders, Again?
Yin Lu
X. Zhu
Tong He
David Wipf
307
0
0
05 Jun 2025
Esoteric Language Models
Esoteric Language Models
Subham Sekhar Sahoo
Zhihan Yang
Yash Akhauri
Johnna Liu
Deepansha Singh
Zhoujun Cheng
Zhengzhong Liu
Eric P. Xing
John Thickstun
Arash Vahdat
255
15
0
02 Jun 2025
Latent Stochastic Interpolants
Latent Stochastic Interpolants
Saurabh Singh
Dmitry Lagun
DiffMBDL
195
1
0
02 Jun 2025
Generalization in VAE and Diffusion Models: A Unified Information-Theoretic Analysis
Generalization in VAE and Diffusion Models: A Unified Information-Theoretic AnalysisInternational Conference on Learning Representations (ICLR), 2025
Qi Chen
Jierui Zhu
Florian Shkurti
DiffM
258
2
0
01 Jun 2025
RelDiff: Relational Data Generative Modeling with Graph-Based Diffusion Models
RelDiff: Relational Data Generative Modeling with Graph-Based Diffusion Models
Valter Hudovernik
Minkai Xu
Juntong Shi
Lovro Šubelj
Stefano Ermon
Erik Štrumbelj
J. Leskovec
DiffM
134
1
0
31 May 2025
On Designing Diffusion Autoencoders for Efficient Generation and Representation Learning
On Designing Diffusion Autoencoders for Efficient Generation and Representation Learning
Magdalena Proszewska
Nikolay Malkin
N. Siddharth
DiffM
284
0
0
30 May 2025
Efficiently Access Diffusion Fisher: Within the Outer Product Span Space
Efficiently Access Diffusion Fisher: Within the Outer Product Span Space
Fangyikang Wang
Hubery Yin
Shaobin Zhuang
Huminhao Zhu
Yinan Li
Lei Qian
Chao Zhang
Hanbin Zhao
Hui Qian
Chen Li
214
3
0
29 May 2025
Learning Single Index Models with Diffusion Priors
Learning Single Index Models with Diffusion Priors
Anqi Tang
Youming Chen
Shuchen Xue
Zhaoqiang Liu
DiffM
235
1
0
27 May 2025
ReDDiT: Rehashing Noise for Discrete Visual Generation
ReDDiT: Rehashing Noise for Discrete Visual Generation
Tianren Ma
Xiaosong Zhang
Boyu Yang
Junlan Feng
QiXiang Ye
DiffM
314
2
0
26 May 2025
Discrete Markov Bridge
Discrete Markov Bridge
Hengli Li
Yuxuan Wang
Song-Chun Zhu
Ying Nian Wu
Zilong Zheng
DiffM
222
0
0
26 May 2025
FLEX: A Backbone for Diffusion-Based Modeling of Spatio-temporal Physical Systems
FLEX: A Backbone for Diffusion-Based Modeling of Spatio-temporal Physical Systems
N. Benjamin Erichson
Vinicius Mikuni
Dongwei Lyu
Yang Gao
Omri Azencot
Soon Hoe Lim
Michael W. Mahoney
AI4CE
1.0K
6
0
23 May 2025
The Spacetime of Diffusion Models: An Information Geometry Perspective
The Spacetime of Diffusion Models: An Information Geometry Perspective
Rafał Karczewski
Markus Heinonen
Alison Pouplin
Søren Hauberg
Vikas Garg
DiffM
301
1
0
23 May 2025
CONCORD: Concept-Informed Diffusion for Dataset Distillation
CONCORD: Concept-Informed Diffusion for Dataset Distillation
Jianyang Gu
Haonan Wang
Ruoxi Jia
Saeed Vahidian
Vyacheslav Kungurtsev
Wei Jiang
Yiran Chen
DiffMDD
1.4K
0
0
23 May 2025
A Unified and Fast-Sampling Diffusion Bridge Framework via Stochastic Optimal Control
A Unified and Fast-Sampling Diffusion Bridge Framework via Stochastic Optimal Control
Mokai Pan
Kaizhen Zhu
Yuexin Ma
Yanwei Fu
Jingyi Yu
Jingya Wang
Ye Shi
315
1
0
23 May 2025
Variational Autoencoding Discrete Diffusion with Enhanced Dimensional Correlations Modeling
Tianyu Xie
Shuchen Xue
Zijin Feng
Tianyang Hu
Jiacheng Sun
Zhenguo Li
Cheng Zhang
DiffM
1.0K
1
0
23 May 2025
Towards more transferable adversarial attack in black-box manner
Chun Tong Lei
Zhongliang Guo
Hon Chung Lee
Minh Quoc Duong
Chun Pong Lau
DiffMAAML
751
2
0
23 May 2025
Learning Flexible Forward Trajectories for Masked Molecular Diffusion
Learning Flexible Forward Trajectories for Masked Molecular Diffusion
Hyunjin Seo
Taewon Kim
Sihyun Yu
SungSoo Ahn
DiffMAI4CE
604
0
0
22 May 2025
Combining Deterministic Enhanced Conditions with Dual-Streaming Encoding for Diffusion-Based Speech Enhancement
Combining Deterministic Enhanced Conditions with Dual-Streaming Encoding for Diffusion-Based Speech EnhancementIEEE Transactions on Audio, Speech, and Language Processing (TASLP), 2025
Hao Shi
Xugang Lu
Kazuki Shimada
Tatsuya Kawahara
DiffM
312
1
0
20 May 2025
A Fourier Space Perspective on Diffusion Models
A Fourier Space Perspective on Diffusion Models
Fabian Falck
Teodora Pandeva
Kiarash Zahirnia
Rachel Lawrence
Richard Turner
Edward Meeds
Javier Zazo
Sushrut Karmalkar
DiffMMedIm
268
15
0
16 May 2025
Diffusion-NPO: Negative Preference Optimization for Better Preference Aligned Generation of Diffusion Models
Diffusion-NPO: Negative Preference Optimization for Better Preference Aligned Generation of Diffusion ModelsInternational Conference on Learning Representations (ICLR), 2025
Fu-Yun Wang
Yunhao Shui
Jingtan Piao
Keqiang Sun
Jiaming Song
244
13
0
16 May 2025
Piloting Structure-Based Drug Design via Modality-Specific Optimal Schedule
Piloting Structure-Based Drug Design via Modality-Specific Optimal Schedule
Keyue Qiu
Yuxuan Song
Zhehuan Fan
Peidong Liu
Zheng Zhang
Mingyue Zheng
Hao Zhou
Wei-Ying Ma
304
1
0
12 May 2025
Topology Guidance: Controlling the Outputs of Generative Models via Vector Field Topology
Topology Guidance: Controlling the Outputs of Generative Models via Vector Field Topology
Xiaohan Wang
Matthew Berger
DiffM
326
0
0
11 May 2025
A 3D pocket-aware and evolutionary conserved interaction guided diffusion model for molecular optimization
A 3D pocket-aware and evolutionary conserved interaction guided diffusion model for molecular optimization
Anjie Qiao
Hao Zhang
Qianmu Yuan
Qirui Deng
Jingtian Su
Wenjie Huang
Huihao Zhou
Guo-Bo Li
Liang Luo
J. Lei
DiffM
172
0
0
09 May 2025
Score-based Self-supervised MRI Denoising
Score-based Self-supervised MRI DenoisingInternational Conference on Learning Representations (ICLR), 2025
Jiachen Tu
Yaokun Shi
Fan Lam
DiffM
253
4
0
08 May 2025
Diffusion Model Quantization: A Review
Diffusion Model Quantization: A Review
Qian Zeng
Chenggong Hu
Weilong Dai
Jie Song
MQ
373
4
0
08 May 2025
ItDPDM: Information-Theoretic Discrete Poisson Diffusion Model
ItDPDM: Information-Theoretic Discrete Poisson Diffusion Model
Sagnik Bhattacharya
Abhiram Gorle
Ahmed Mohsin
Ahsan Bilal
Connor Ding
Amit Kumar Singh Yadav
DiffM
659
1
0
08 May 2025
Convergence Of Consistency Model With Multistep Sampling Under General Data Assumptions
Convergence Of Consistency Model With Multistep Sampling Under General Data Assumptions
Yiding Chen
Yiyi Zhang
Owen Oertell
Wen Sun
DiffM
263
2
0
06 May 2025
Diffusion Models are Secretly Exchangeable: Parallelizing DDPMs via Autospeculation
Diffusion Models are Secretly Exchangeable: Parallelizing DDPMs via Autospeculation
Hengyuan Hu
Aniket Das
Dorsa Sadigh
Nima Anari
DiffM
346
5
0
06 May 2025
Variational diffusion transformers for conditional sampling of supernovae spectra
Variational diffusion transformers for conditional sampling of supernovae spectra
Yunyi Shen
Alexander T. Gagliano
DiffM
204
2
0
05 May 2025
Quantizing Diffusion Models from a Sampling-Aware Perspective
Quantizing Diffusion Models from a Sampling-Aware Perspective
Qian Zeng
Jie Song
Yuanyu Wan
Huiqiong Wang
Mingli Song
DiffMMQ
292
1
0
04 May 2025
Analytic Energy-Guided Policy Optimization for Offline Reinforcement Learning
Analytic Energy-Guided Policy Optimization for Offline Reinforcement Learning
Jifeng Hu
Sili Huang
Zhiyong Yang
Shengchao Hu
Li Shen
Hechang Chen
Lichao Sun
Yi-Ju Chang
Dacheng Tao
OffRL
932
0
0
03 May 2025
DGSolver: Diffusion Generalist Solver with Universal Posterior Sampling for Image Restoration
DGSolver: Diffusion Generalist Solver with Universal Posterior Sampling for Image Restoration
Jian Shu
Jing Zhang
Haonan Guo
Haiyan Zhao
Jiayi Ma
Bo Du
403
1
0
30 Apr 2025
Revisiting Diffusion Autoencoder Training for Image Reconstruction Quality
Revisiting Diffusion Autoencoder Training for Image Reconstruction Quality
Pramook Khungurn
Sukit Seripanitkarn
Phonphrm Thawatdamrongkit
Supasorn Suwajanakorn
DiffM
354
0
0
30 Apr 2025
A 3D pocket-aware and affinity-guided diffusion model for lead optimization
A 3D pocket-aware and affinity-guided diffusion model for lead optimization
Anjie Qiao
Junjie Xie
Wenjie Huang
Hao Zhang
Jiahua Rao
Shuangjia Zheng
Yuedong Yang
Liang Luo
Guo-Bo Li
J. Lei
DiffMMedIm
245
3
0
29 Apr 2025
Flow Along the K-Amplitude for Generative Modeling
Flow Along the K-Amplitude for Generative Modeling
Weitao Du
Shuning Chang
Jiasheng Tang
Yu Rong
F. Wang
Shengchao Liu
255
0
0
27 Apr 2025
DSPO: Direct Semantic Preference Optimization for Real-World Image Super-Resolution
DSPO: Direct Semantic Preference Optimization for Real-World Image Super-Resolution
Miaomiao Cai
Simiao Li
Wei Li
X. Y. Huang
Hanting Chen
Jie Hu
Yunhe Wang
256
8
0
21 Apr 2025
Entropic Time Schedulers for Generative Diffusion Models
Entropic Time Schedulers for Generative Diffusion Models
Dejan Stancevic
Luca Ambrogioni
Luca Ambrogioni
DiffMOOD
344
3
0
18 Apr 2025
Generalized Visual Relation Detection with Diffusion Models
Generalized Visual Relation Detection with Diffusion Models
Kaifeng Gao
Siqi Chen
Hanwang Zhang
Jun Xiao
Yueting Zhuang
Qianru Sun
285
0
0
16 Apr 2025
Diffusion Based Ambiguous Image Segmentation
Diffusion Based Ambiguous Image SegmentationScandinavian Conference on Image Analysis (SCIA), 2025
Jakob Lønborg Christensen
M. Hannemose
Anders Bjorholm Dahl
Vedrana Andersen Dahl
DiffMMedIm
315
0
0
08 Apr 2025
Multi-resolution Score-Based Variational Graphical Diffusion for Causal Disaster System Modeling and Inference
Multi-resolution Score-Based Variational Graphical Diffusion for Causal Disaster System Modeling and Inference
Xuechun Li
Shan Gao
Susu Xu
DiffM
248
0
0
05 Apr 2025
Artificial Intelligence and Deep Learning Algorithms for Epigenetic Sequence Analysis: A Review for Epigeneticists and AI Experts
Artificial Intelligence and Deep Learning Algorithms for Epigenetic Sequence Analysis: A Review for Epigeneticists and AI Experts
Muhammad Tahir
Mahboobeh Norouzi
Shehroz S. Khan
James Davie
Soichiro Yamanaka
A. Ashraf
331
16
0
01 Apr 2025
Time-Series Forecasting via Topological Information Supervised Framework with Efficient Topological Feature Learning
Time-Series Forecasting via Topological Information Supervised Framework with Efficient Topological Feature Learning
Zixin Lin
Nur Fariha Syaqina Zulkepli
AI4TSAI4CE
207
1
0
31 Mar 2025
High-Fidelity Diffusion Face Swapping with ID-Constrained Facial Conditioning
High-Fidelity Diffusion Face Swapping with ID-Constrained Facial Conditioning
Dailan He
Xinyu Wang
Shulun Wang
Guanglu Song
Bingqi Ma
Hao Shao
Y. Liu
Jiaming Song
DiffM
252
2
0
28 Mar 2025
Previous
123456...171819
Next