ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 2002.10880
  4. Cited By
PolyGen: An Autoregressive Generative Model of 3D Meshes

PolyGen: An Autoregressive Generative Model of 3D Meshes

International Conference on Machine Learning (ICML), 2020
23 February 2020
C. Nash
Yaroslav Ganin
A. Eslami
Peter W. Battaglia
    AI4CE
ArXiv (abs)PDFHTML

Papers citing "PolyGen: An Autoregressive Generative Model of 3D Meshes"

50 / 212 papers shown
LaFiTe: A Generative Latent Field for 3D Native Texturing
LaFiTe: A Generative Latent Field for 3D Native Texturing
Chia-Hao Chen
Zi-Xin Zou
Yan-Pei Cao
Ze Yuan
Guan Luo
Xiaojuan Qi
Ding Liang
Song-Hai Zhang
Yuan-Chen Guo
198
2
0
04 Dec 2025
AutoBrep: Autoregressive B-Rep Generation with Unified Topology and Geometry
AutoBrep: Autoregressive B-Rep Generation with Unified Topology and GeometryACM SIGGRAPH Conference and Exhibition on Computer Graphics and Interactive Techniques in Asia (SIGGRAPH Asia), 2025
Xiang Xu
P. Jayaraman
Joseph George Lambourne
Yilin Liu
Durvesh Malpure
Pete Meltzer
AI4CE
241
4
0
02 Dec 2025
BrepGPT: Autoregressive B-rep Generation with Voronoi Half-Patch
BrepGPT: Autoregressive B-rep Generation with Voronoi Half-PatchACM Transactions on Graphics (TOG), 2025
Pu Li
Wenhao Zhang
Weize Quan
Biao Zhang
Peter Wonka
Dong-ming Yan
132
1
0
27 Nov 2025
Mesh RAG: Retrieval Augmentation for Autoregressive Mesh Generation
Mesh RAG: Retrieval Augmentation for Autoregressive Mesh Generation
Xiatao Sun
Chen Liang
Qian Wang
Daniel Rakita
AI4CE
189
0
0
20 Nov 2025
SVG360: Multi-View SVG Generation with Geometric and Color Consistency from a Single SVG
SVG360: Multi-View SVG Generation with Geometric and Color Consistency from a Single SVG
Mengnan Jiang
Zhaolin Sun
Christian Franke
Michele Franco Adesso
Antonio Haas
Grace Li Zhang
3DGS
282
0
0
20 Nov 2025
StrucADT: Generating Structure-controlled 3D Point Clouds with Adjacency Diffusion Transformer
StrucADT: Generating Structure-controlled 3D Point Clouds with Adjacency Diffusion TransformerIEEE Transactions on Visualization and Computer Graphics (TVCG), 2025
Zhenyu Shu
Jiajun Shen
Zhongui Chen
Xiaoguang Han
Shiqing Xin
DiffM
165
0
0
28 Sep 2025
ARMesh: Autoregressive Mesh Generation via Next-Level-of-Detail Prediction
ARMesh: Autoregressive Mesh Generation via Next-Level-of-Detail Prediction
Jiabao Lei
Kewei Shi
Zhihao Liang
Kui Jia
3DHAI4CE
301
5
0
25 Sep 2025
Hunyuan3D Studio: End-to-End AI Pipeline for Game-Ready 3D Asset Generation
Hunyuan3D Studio: End-to-End AI Pipeline for Game-Ready 3D Asset Generation
Biwen Lei
Yang Li
Xinhai Liu
Shuhui Yang
Lixin Xu
...
Y. Liu
Linus
Jie Jiang
Zhuo Chen
Chunchao Guo
VGen
251
7
0
16 Sep 2025
Artist-Created Mesh Generation from Raw Observation
Artist-Created Mesh Generation from Raw Observation
Yao He
Youngjoong Kwon
Wenxiao Cai
Ehsan Adeli
3DPC
122
1
0
15 Sep 2025
Unifi3D: A Study on 3D Representations for Generation and Reconstruction in a Common Framework
Unifi3D: A Study on 3D Representations for Generation and Reconstruction in a Common Framework
Nina Wiedemann
Sainan Liu
Quentin Leboutet
Katelyn Gao
Benjamin Ummenhofer
Michael Paulitsch
Kai Yuan
228
0
0
02 Sep 2025
FastMesh: Efficient Artistic Mesh Generation via Component Decoupling
FastMesh: Efficient Artistic Mesh Generation via Component Decoupling
Jeonghwan Kim
Yushi Lan
Armando Fortes
Yongwei Chen
Xingang Pan
288
4
0
26 Aug 2025
VertexRegen: Mesh Generation with Continuous Level of Detail
VertexRegen: Mesh Generation with Continuous Level of Detail
Xiang Zhang
Yawar Siddiqui
A. Avetisyan
Chris Xie
Jakob Julian Engel
Henry Howard-Jenkins
3DH
113
7
0
12 Aug 2025
3DFroMLLM: 3D Prototype Generation only from Pretrained Multimodal LLMs
3DFroMLLM: 3D Prototype Generation only from Pretrained Multimodal LLMs
Noor Ahmed
Cameron Braunstein
Steffen Eger
Eddy Ilg
169
1
0
12 Aug 2025
LL3M: Large Language 3D Modelers
LL3M: Large Language 3D Modelers
Sining Lu
Guan Chen
Nam Anh Dinh
Itai Lang
Ari Holtzman
Rana Hanocka
AI4CE
193
7
0
11 Aug 2025
MeshLLM: Empowering Large Language Models to Progressively Understand and Generate 3D Mesh
MeshLLM: Empowering Large Language Models to Progressively Understand and Generate 3D Mesh
Shuangkang Fang
I-Chao Shen
Yufeng Wang
Yi-Hsuan Tsai
Y. Yang
Shuchang Zhou
Wenrui Ding
Takeo Igarashi
M. Yang
AI4CE
322
8
0
02 Aug 2025
Ultra3D: Efficient and High-Fidelity 3D Generation with Part Attention
Ultra3D: Efficient and High-Fidelity 3D Generation with Part Attention
Yiwen Chen
Zhihao Li
Yikai Wang
Hu Zhang
Cunliang Kong
Chi Zhang
Guosheng Lin
DiffM
485
20
0
23 Jul 2025
Recursive Variational Autoencoders for 3D Blood Vessel Generative Modeling
Recursive Variational Autoencoders for 3D Blood Vessel Generative Modeling
Paula Feldman
Miguel Fainstein
Viviana Siless
C. Delrieux
Emmanuel Iarussi
MedIm
157
1
0
17 Jun 2025
TexTailor: Customized Text-aligned Texturing via Effective Resampling
TexTailor: Customized Text-aligned Texturing via Effective ResamplingInternational Conference on Learning Representations (ICLR), 2025
Suin Lee
Dae-Shik Kim
DiffM
302
0
0
12 Jun 2025
Feature-aware Hypergraph Generation via Next-Scale Prediction
Feature-aware Hypergraph Generation via Next-Scale Prediction
Dorian Gailhard
Enzo Tartaglione
Lirida Naviner
Jhony H. Giraldo
326
0
0
02 Jun 2025
LTM3D: Bridging Token Spaces for Conditional 3D Generation with Auto-Regressive Diffusion Framework
LTM3D: Bridging Token Spaces for Conditional 3D Generation with Auto-Regressive Diffusion Framework
Xin Kang
Zihan Zheng
Lei Chu
Yue Gao
Jiahao Li
Hao Pan
Xuejin Chen
Yan Lu
DiffM
212
0
0
30 May 2025
ART-DECO: Arbitrary Text Guidance for 3D Detailizer Construction
ART-DECO: Arbitrary Text Guidance for 3D Detailizer Construction
Qimin Chen
Yuezhi Yang
Yifang Wang
Vladimir G. Kim
Siddhartha Chaudhuri
Hao Zhang
Zhiqin Chen
DiffM
447
2
0
26 May 2025
Generating Physically Stable and Buildable Brick Structures from Text
Generating Physically Stable and Buildable Brick Structures from TextIEEE Transactions on Pattern Analysis and Machine Intelligence (TPAMI), 2021
Ava Pun
Kangle Deng
Ruixuan Liu
Deva Ramanan
Changliu Liu
Jun-Yan Zhu
1.1K
0
0
08 May 2025
Recent Advances in 3D Object and Scene Generation: A Survey
Recent Advances in 3D Object and Scene Generation: A Survey
Xiang Tang
Ruotong Li
Xiaopeng Fan
548
3
0
16 Apr 2025
OctGPT: Octree-based Multiscale Autoregressive Models for 3D Shape Generation
OctGPT: Octree-based Multiscale Autoregressive Models for 3D Shape Generation
Si-Tong Wei
Rui-Huan Wang
Chuan-Zhi Zhou
Baoquan Chen
Peng-Shuai Wang
498
13
0
14 Apr 2025
QEMesh: Employing A Quadric Error Metrics-Based Representation for Mesh Generation
QEMesh: Employing A Quadric Error Metrics-Based Representation for Mesh Generation
Jiaqi Li
Ruowei Wang
Yu Liu
Qijun Zhao
410
0
0
08 Apr 2025
PRISM: Probabilistic Representation for Integrated Shape Modeling and Generation
PRISM: Probabilistic Representation for Integrated Shape Modeling and Generation
Lei Cheng
Mahdi Saleh
Qing Cheng
Lu Sang
Hongli Xu
Zorah Lähner
F. Tombari
237
0
0
06 Apr 2025
SparseFlex: High-Resolution and Arbitrary-Topology 3D Shape Modeling
SparseFlex: High-Resolution and Arbitrary-Topology 3D Shape Modeling
Xianglong He
Zi-Xin Zou
Chia-Hao Chen
Xu Tan
Ding Liang
Chun Yuan
Wanli Ouyang
Yan-Pei Cao
Yangguang Li
369
46
0
27 Mar 2025
MAR-3D: Progressive Masked Auto-regressor for High-Resolution 3D Generation
MAR-3D: Progressive Masked Auto-regressor for High-Resolution 3D GenerationComputer Vision and Pattern Recognition (CVPR), 2025
Jinnan Chen
Lingting Zhu
Zeyu Hu
Shengju Qian
Yuxiao Chen
Xin Wang
G. Lee
630
9
0
26 Mar 2025
iFlame: Interleaving Full and Linear Attention for Efficient Mesh Generation
iFlame: Interleaving Full and Linear Attention for Efficient Mesh Generation
Hanxiao Wang
Biao Zhang
Weize Quan
Dong-ming Yan
Peter Wonka
422
8
0
20 Mar 2025
Unified Cross-Scale 3D Generation and Understanding via Autoregressive Modeling
Unified Cross-Scale 3D Generation and Understanding via Autoregressive Modeling
Shuqi Lu
Haowei Lin
Lin Yao
Zhifeng Gao
Xiaohong Ji
Weinan E
Weinan E
Linfeng Zhang
Guolin Ke
415
2
0
20 Mar 2025
DTGBrepGen: A Novel B-rep Generative Model through Decoupling Topology and Geometry
DTGBrepGen: A Novel B-rep Generative Model through Decoupling Topology and GeometryComputer Vision and Pattern Recognition (CVPR), 2025
Jing Li
Yihang Fu
Falai Chen
AI4CE
329
16
0
17 Mar 2025
TreeMeshGPT: Artistic Mesh Generation with Autoregressive Tree Sequencing
TreeMeshGPT: Artistic Mesh Generation with Autoregressive Tree SequencingComputer Vision and Pattern Recognition (CVPR), 2025
S. Lionar
Jiabin Liang
G. Lee
3DPC
319
22
0
14 Mar 2025
Representing 3D Shapes With 64 Latent Vectors for 3D Diffusion Models
Representing 3D Shapes With 64 Latent Vectors for 3D Diffusion Models
I. Cho
Youngbeom Yoo
Subin Jeon
Seon Joo Kim
DiffM
433
4
0
11 Mar 2025
MatchMaker: Automated Asset Generation for Robotic Assembly
MatchMaker: Automated Asset Generation for Robotic AssemblyIEEE International Conference on Robotics and Automation (ICRA), 2025
Yian Wang
Bingjie Tang
Chuang Gan
Dieter Fox
Kaichun Mo
Yashraj S. Narang
Iretiayo Akinola
385
3
0
07 Mar 2025
PuzzleFusion++: Auto-agglomerative 3D Fracture Assembly by Denoise and Verify
PuzzleFusion++: Auto-agglomerative 3D Fracture Assembly by Denoise and VerifyInternational Conference on Learning Representations (ICLR), 2024
Zhengqing Wang
Jiacheng Chen
Yasutaka Furukawa
584
19
0
24 Feb 2025
MagicArticulate: Make Your 3D Models Articulation-Ready
MagicArticulate: Make Your 3D Models Articulation-ReadyComputer Vision and Pattern Recognition (CVPR), 2025
Chaoyue Song
Jianfeng Zhang
Xiu Li
Fan Yang
Yiwen Chen
...
Jun Hao Liew
Xiaoyang Guo
Fayao Liu
Jiashi Feng
Guosheng Lin
425
25
0
17 Feb 2025
Autoregressive Generation of Static and Growing Trees
Autoregressive Generation of Static and Growing Trees
Hanxiao Wang
Biao Zhang
Jonathan Klein
D. Michels
Dong‐Ming Yan
Peter Wonka
202
2
0
07 Feb 2025
Shape from Semantics: 3D Shape Generation from Multi-View Semantics
Shape from Semantics: 3D Shape Generation from Multi-View Semantics
Liangchen Li
Caoliwen Wang
Yuqi Zhou
Bailin Deng
Juyong Zhang
3DV
522
0
0
01 Feb 2025
CAD-GPT: Synthesising CAD Construction Sequence with Spatial Reasoning-Enhanced Multimodal LLMs
CAD-GPT: Synthesising CAD Construction Sequence with Spatial Reasoning-Enhanced Multimodal LLMsAAAI Conference on Artificial Intelligence (AAAI), 2024
Siyu Wang
Cailian Chen
Xinyi Le
Qimin Xu
Lei Xu
Yujiao Shi
Jie Yang
3DV
682
41
0
27 Dec 2024
MeshArt: Generating Articulated Meshes with Structure-Guided Transformers
MeshArt: Generating Articulated Meshes with Structure-Guided TransformersComputer Vision and Pattern Recognition (CVPR), 2024
Daoyi Gao
Yawar Siddiqui
Lei Li
Angela Dai
418
33
0
16 Dec 2024
Coherent 3D Scene Diffusion From a Single RGB Image
Coherent 3D Scene Diffusion From a Single RGB ImageNeural Information Processing Systems (NeurIPS), 2024
Manuel Dahnert
Angela Dai
Norman Muller
Matthias Nießner
318
4
0
13 Dec 2024
3D Mesh Editing using Masked LRMs
3D Mesh Editing using Masked LRMs
Will Gao
Dilin Wang
Yuchen Fan
Aljaz Bozic
Tuur Stuyck
Zhengqin Li
Zhao Dong
Rakesh Ranjan
N. Sarafianos
459
6
0
11 Dec 2024
SceneFactor: Factored Latent 3D Diffusion for Controllable 3D Scene
  Generation
SceneFactor: Factored Latent 3D Diffusion for Controllable 3D Scene GenerationComputer Vision and Pattern Recognition (CVPR), 2024
Alexey Bokhovkin
Quan Meng
Shubham Tulsiani
Angela Dai
DiffM
516
20
0
02 Dec 2024
3D-WAG: Hierarchical Wavelet-Guided Autoregressive Generation for High-Fidelity 3D Shapes
3D-WAG: Hierarchical Wavelet-Guided Autoregressive Generation for High-Fidelity 3D Shapes
Tejaswini Medi
Arianna Rampini
Pradyumna Reddy
P. Jayaraman
Margret Keuper
DiffM
680
1
0
28 Nov 2024
GeoFormer: A Multi-Polygon Segmentation Transformer
GeoFormer: A Multi-Polygon Segmentation TransformerBritish Machine Vision Conference (BMVC), 2024
Maxim Khomiakov
Michael Riis Andersen
J. Frellsen
281
1
0
25 Nov 2024
Don't Mesh with Me: Generating Constructive Solid Geometry Instead of Meshes by Fine-Tuning a Code-Generation LLM
Don't Mesh with Me: Generating Constructive Solid Geometry Instead of Meshes by Fine-Tuning a Code-Generation LLM
Maximilian Mews
Ansar Aynetdinov
Vivian Schiller
Peter Eisert
Alan Akbik
3DVAI4CE
975
4
0
22 Nov 2024
Wavelet Latent Diffusion (Wala): Billion-Parameter 3D Generative Model
  with Compact Wavelet Encodings
Wavelet Latent Diffusion (Wala): Billion-Parameter 3D Generative Model with Compact Wavelet Encodings
Aditya Sanghi
Aliasghar Khani
Pradyumna Reddy
Arianna Rampini
Derek Cheung
Kamal Rahimi Malekshan
Kanika Madan
Hooman Shayani
398
10
0
12 Nov 2024
Scaling Mesh Generation via Compressive Tokenization
Scaling Mesh Generation via Compressive TokenizationComputer Vision and Pattern Recognition (CVPR), 2024
Haohan Weng
Zibo Zhao
Biwen Lei
Xiaoyu Yang
Jian Liu
...
Jie Jiang
Chunchao Guo
Tianze Zhang
Shenghua Gao
Cheng Chen
393
55
0
11 Nov 2024
CAD-MLLM: Unifying Multimodality-Conditioned CAD Generation With MLLM
CAD-MLLM: Unifying Multimodality-Conditioned CAD Generation With MLLM
Jingwei Xu
Chenyu Wang
Zibo Zhao
Wen Liu
Yi-An Ma
Shenghua Gao
532
56
0
07 Nov 2024
GenUDC: High Quality 3D Mesh Generation with Unsigned Dual Contouring
  Representation
GenUDC: High Quality 3D Mesh Generation with Unsigned Dual Contouring RepresentationACM Multimedia (MM), 2024
Ruowei Wang
Jiaqi Li
Dan Zeng
Xueqi Ma
Zixiang Xu
Jianwei Zhang
Qijun Zhao
293
2
0
23 Oct 2024
12345
Next
Page 1 of 5